KOCHI REFINERY

Sector : Oil & Gas

Project : Shut Down & Maintenance

Rose Court project for MJ Lonsdale

CITY GAS

Sector : Oil & Gas

Project : Cross Country Pipe Line

INTEGRATED REFINERY EXPANSION PROJECT IREP

Sector : Oil & Gas

Project : Design & Construction

Oil Gas Design

KAPRI BOTTLING PLANT

Sector : Oil & Gas

Project : Periodic Inspection

Oil gas Periodic Inspection

WILLINGTON TERMINAL

Sector : Oil & Gas

Project : Maintenance & Repair

TECHNOPARK

Sector : Infrastructure

Project : MEP & HVAC

Infrastructure project

MARRIOT GOCHI

Sector : Hospitality

Project : MEP

LULU MALL & HYPER MARKET

Sector : Retail

Project : Utilities

ENGINEERING COMPANY

Sector : Manufacturing

Project : Fabrication of LPG Bullet

IMPORT FACILITY

Sector : Oil & Gas

Project : Plant Lay Out

Oil and gas Project
Drauen

POWER PLANT

Sector : Power

Project : HSD Storage Tank

Drauen
Drauen
Drauen
Drauen
Drauen
Drauen
Drauen

Discalaimer: Due to security reason some of the details provided in the site are typical and not actual, and a few of licences used for parts of production which are out sourced are owned by our providers, also some of the services shown here are not part of the current offering

Drauen.  © 2024. All rights reserved 

ROSE COURT

  • Client: MJ Lonsdale

  • Architects: BDG

  • Building Services Consultants: Hoare Lea

  • Value to CAD SERVICES: £270,000

  • Revit 2019 using Fabrication CAD mep parts

Rose Court Shell and Core MEP, Basement, Ground to Level 11 and Roof, with small Plant zones on levels 9, 11 & 12.

Rose Court Fit Out Ground, First to Eleventh. Shell & Core works also include all the Services within the toilet spaces.

CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings and act as the initial point of contact between ourselves and for proof of QA and clash checks of CSD Models.

CAD Services produced co-ordinated drawings for MJL. Attended weekly co-ordination meetings, and provide clash detection reports for co-ordinated drawings. We provided Single Services Drawings for Ventilation, Pipework and Containment  along with Builderswork Drawings and Co-ordinated RCP’s.

The development of the BIM model for services utilised Revit 2019 using Fabrication Parts.

Hoxton Hotel

  • Client: Imtech

  • Architects: EPR Architects

  • Building Services Consultants: Hoare Lea

  • Value to CAD SERVICES: £182,000

  • Revit 2019 using Fabrication CAD mep parts

This project comprised of demolition of the Threshold and Union House at 65-69 Shepherd’s Bush Green and construction of a hotel comprising 237 ensuite bedrooms over 8 levels alongside all day hospitality including a restaurant, bar and meeting facilities on the Ground Floor and associated back of house areas and external courtyard.

CAD Services assisted with Basement and 2 plant spaces, Level 00 to 06 and Roof Plant, 11 Room Types, 2 Main Risers and Typical Room Risers.

CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings, to act as the initial point of contact between ourselves and for proof of QA and clash checks of CSD Models. CAD Services produced co-ordinated drawings for Imtech. We hosted weekly co-ordination meetings and provided clash detection reports 

We provided Combined Services Drawings along with Single Services Drawings for Ventilation, Pipework, Containment for Mechanical, Electrical and Public Health Services along with Lighting, Small Power, Fire Alarm, Data and Schematics .
The development of the model for services will be utilising Revit 2019 with Fabrication Parts.

OAK CANCER CENTRE
ROYAL MARSDEN HOSPITAL

  • Client: Michael J Lonsdale

  • Architects: BDP

  • Building Services Consultants: Desco

  • Value to CAD SERVICES: £385,000

  • Revit 2019 using Fabrication CAD mep parts

Oak Cancer Centre at is a new clinical care, diagnostic and research building at the Royal Marsden Hospital in Sutton. The building’s purpose is to re-provide all the Sutton out-patient and day care clinics together with a new rapid access diagnostic facility. There will also be a research floor accommodating 300 scientist and a mixture of social spaces including a rooftop restaurant. The building will be designed to promote better interaction between researchers, patients and clinical teams. CAD Services assisted with Lower Ground, Ground to Third Floors with Roof Plant and Plant Spaces within Lower Ground and Third Floor.

CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings and act as the initial point of contact between ourselves and MJL for proof of QA and clash checks of CSD Models. We attended and hosted weekly co-ordination meetings and provided clash detection reports. We provided Combined Services drawings and Single Services Drawings for Electrical, Ventilation & Pipework with Builderswork Drawings.

WARWICK COURT

  • Client: MJ Lonsdale

  • Architects: Fletcher Priest Architects

  • Building Services Consultants: Waterman Group

  • Value to CAD SERVICES: £140,000

  • Revit 2020 using Fabrication CADmep parts

Warwick Court is a mixed use building that consists of Basement, Lower Ground, Ground to level 7 and Roof. The project was a Full Shell & Core CAT A Fit Out with the exception
of Retail spaces and W.C Fit Out that is by others.


CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings and act as the initial point of contact between ourselves and MJL for proof of QA and clash checks of CSD Models. We attended or hosted weekly co-ordination meetings, and provided clash detection reports for co-ordinated drawings. We produced Single Services Drawings for Containment, Ventilation & Pipework along with Symbol Type drawings .

The development of the model for services will be utilising  Revit 2020 using Fabrication CADmep Parts.

UAL STRATFORD

  • Client: MJ Lonsdale

  • Architects: Allies and Morrison

  • Building Services Consultants: Buro Happold Engineering

  • Value to CAD SERVICES: £445,000

  • Revit 2020 using Fabrication CADmep parts

UAL Stratford is Shell & Core and Fit Out that consisted of Waterfront, Mezzanine, Podium levels, levels 02 to 13 High & Low
Level, On Floor Plantrooms on levels 3M, 4 and 6 along with Roof and Roof Mezzanine Plant Areas.

CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings and acted as the initial point of contact between ourselves and MJL. They were available for proof of QA and clash checks of CSD Models. CAD Services produced co-ordinated drawings for MJL. We attended weekly co-ordination meetings and provided clash detection reports for co-ordinated drawings. We produced Single Services Drawings for Ventilation, Containment and Pipework along with Builderswork Drawings.

The development of the BIM model for services will be utilising
Revit 2020 using Fabrication CADmep Parts.

IPG MEDIABRANDS

  • Client: SALE Group

  • Architect: MCM.

  • Building Services Consultants: Cundall

  • Value to CAD SERVICES: £50,000

  • Revit 2019 using Fabrication CADmep parts

IPG Mediabrands consisted of CAT B Changes to the Lower Ground, Levels 02 to 08  and Tea Points .

CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings and act as the
initial point of contact between ourselves and SALE Group. They  were available to proof QA and clash checks of CSD Models. CAD Services produced co-ordinated drawings for Sale Group.
We attended weekly co-ordination meetings and provided clash detection reports for co-ordinated drawings. We produced Single Services Drawings for Ventilation, Pipework Drawings for Mechanical and Public Health Services. 

The development of the model for services utilised Revit 2019 using Fabrication Parts.

SENATOR HOUSE

  • Client: SALE Group

  • Architect: MCM Architecture Ltd

  • Building Services Consultants: Hurley Palmer Flatt

  • Value to CAD SERVICES: £60,000

  • Revit 2019 using Fabrication CADmep parts

Financial services firm Quilter relocated to Senator House, 85 Queen Victoria Street, EC4.  Quilter will occupy space across six floors at the building near to Cannon Street station, which has recently undergone a refurbishment designed by Ben Adams Architects. CAD Services assisted in the CAT B Fit Out for Mechanical Services of 5 floors, consisting of levels 01, 03, 06, part of 07 and Roof Plant. 

CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings. We acted as the initial point of contact with SALE Group for proof of QA and clash checks of CSD Models. CAD Services produced co-ordinated drawings for Sale Group. CAD Services attended weekly co-ordination meetings and provided clash detection reports, Co-ordinated drawings, Single Services Drawings for Ventilation, Pipework,  along with Builderswork Drawings for Mechanical and Public Heath Services.

The development of the model for services will be utilising Fabrication MEP.

BIRMINGHAM COUNCIL HOUSE REFURBISHMENT

  • Client: E7 Building Services

  • Architects: Rodney Melville & Partners

  • Building Services Consultants: Hoare Lea

  • Value to CAD SERVICES: £135,000

  • Revit 2020 using Fabrication CAD mep parts

A project to make Birmingham’s Council House fit for the 21st century. The £32.5m scheme saw the Council House, the Council House extension and part of Birmingham Museum and Art Gallery undergo extensive electrical refurbishment to both modernise the building and ensure the safety of councillors, staff and visitors who use the different parts of it.

The work was needed to update the electrical installation in the Council House.

CAD Services assisted with two of the Buildings, the Council Office Building with Lower Basement, Basement Ground, First to Third Floor and Roof and Extension Building Ground to Third and Roof.

CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings and act as the initial point of contact between ourselves and E7 Building Services for proof of QA and clash checks of CSD Models. We attended and hosted weekly co-ordination meetings and provided clash detection reports. We provided Single Services Drawings for Electrical Containment with Builderswork Drawings.

The development of the model for services will be utilising Revit 2019 or 2020 using Fabrication Parts

LOTS ROAD PROJECT KENSINGTON & CHELSEA

  • Client: ARK M&E Ltd

  • Architects: Midgard Design Services

  • Building Services Consultants: MLM Group

  • Value to CAD SERVICES: £125,000

  • Revit 2019 using Fabrication CAD mep parts

Lots Road is a major mixed-use redevelopment of a former power station situated either side of Chelsea Creek on the north bank of the River Thames in Chelsea. The focal point of the development is the conversion of the main power station building into an expanded village centre enabling pedestrian access to the river.

We assisted with Shell & Core, Basement B1 & B2 and Plantrooms areas.

CAD Services provided a team leader dedicated to the project to oversee the production of models and drawings and act as the initial point of contact between ourselves and Ark. We attended fortnightly co-ordination meetings and provided clash detection reports for proof of QA and clash checks of CSD Models. CAD Services produced Co-ordinated Drawings Shell & Core, Basement B1 & B2 and Plantrooms areas. The development of the BIM model for services utilised Revit 2019 using Fabrication Parts